Facility Alteration Permit
A Facility Alteration Permit (FAP): Construction or installation of all equipment, facilities, and devices, or alterations made to any Regina Airport Authority (RAA) property and/or leased property at the airport must receive RAA approval.
Dig Permit
A Dig Permit Application MUST be completed and APPROVED PRIOR to disturbing the ground or commencing any work that may cause ground disturbance.
Building Permit
A Building Permit (BP) may be required based on the scope of the Facility Alteration Permit (FAP). After FAP submission, the Regina Airport Authority may ask for a BP submission, which will be reviewed by the Building Official (Municode). Only after the completion of the review can the contactor proceed with the work. The Building Permit will require a sealed drawing from an Engineer/Architect, along with a Commitment for Field Review.
NavCanada Land Use Permit & RAA Development Review
The airways and airspace across Canada are controlled by NavCanada. New obstacles introduced into Canada’s controlled airspaces require review and approval from NavCanada.
Whether your work has involved a Facility Alteration Permit, a Dig Permit, or a Building Permit with the Regina Airport Authority (RAA), or whether you are building within 4 kilometres of the Regina International Airport (YQR), your project may also need approval through NavCanada’s Land Use Program.
Crane Permit
A Temporary Crane Assessment MUST be completed and APPROVED PRIOR to commencing any work.